Stage One December 2007 Images
Placement of concrete for retaining wall structure along Hasley Canyon Road north bound off ramp, under Biscailuz Bridge
|
Footing excavation for retaining wall along Hasley Canyon Road north bound off ramp
|
, Looking north from Castaic Creek Bridge, pile driving operation for retaining at Hasley Canyon north bound off ramp
|
Construction of new curb and gutter and side walk along The Old Road
|
Placement of a concrete for new curb and gutter and sidewalk, along the east side of The Old Road, north of Sedona Way
|
Grate line and storm drain along the new Hasley Canyon Road soutn bound off ramp
|
Concrete base for new Hasley Canyon Road south bound on ramp at Sedona Way
|
Paving operations for new Hasley Canyon Road south bound on ramp.
|
Paving operations for new Hasley Canyon Road south bound off ramp
|
Construction of retaining wall and storm drain along Hasley Canyon Road north bound off ramp
|
Begin forming for retaining wall along Hasley Canyon north bound off ramp
|
Excavation of retaining wall footing, along Hasley Canyon Road off ramp, south of Castaic Creek
|
Looking south, paving operations for new Hasley Canyon Road south bound off ramp
|
|
|
|