| RIO HONDO BYPASS |
| - Zone 1 Ditch |
| STATION NO. F313B-R |
|
| RECORDER: 5 min. interval data logger. |
| METHOD OF MEASUREMENT: Wading or from footbridge. |
| DRAINAGE AREA: Controlled. 445.7 square miles. |
| LOCATION: On the left (south) bank of the channel 400 feet below diversion headworks. |
| REGULATION: Flow regulated at headworks installed to divert a portion of Zone I water from the San Gabriel River to the Rio Hondo Channel. |
| DIVERSION: None. |
| CHANNEL: Soil, sand, and clay. |
| CONTROL: Artificial controls below station. |
| LENGTH OF RECORD: October 1, 1953 to October 1, 1963, and from October 1, 1974 to September 30, 1982, and from October 1, 1982 to date. |
| REMARKS: Used only for Zone I purchased water diverted to Rio Hondo Spreading Grounds. |
| |
|
|
|
|
|
|